TL;DR
NASA has revised the mission designs for SpaceX and Blue Origin lunar landers, moving their rendezvous with Orion from lunar orbit to partner-specific orbits as the agency targets crewed Moon landings in 2028. Both companies must complete uncrewed demonstrations, and NASA will select the first lander based on readiness; the schedule and choice remain uncertain.
NASA has revised the operating plans for lunar landers being developed by SpaceX and Blue Origin, changing where each lander will meet the Orion spacecraft as the agency works toward crewed Moon missions targeted for 2028. The updated plans use Earth orbit for SpaceX’s rendezvous and an elliptical polar lunar orbit for Blue Origin’s, replacing the previously planned shared approach involving a near-rectilinear halo orbit.
Prime made for students and young adults
- Fast, free delivery for dorm and study essentials
- Prime Video and Amazon Music included
- Member-only deals
Under NASA’s Artemis mission plan, astronauts will launch from Kennedy Space Center aboard the Space Launch System (SLS) rocket in Orion. Two crew members will transfer to a commercial lander for descent to the Moon, while two others remain in Orion. NASA says both companies are developing crew and cargo lander versions, and each must conduct an uncrewed demonstration before a crewed mission. The agency will certify lander systems before astronauts fly on them.
SpaceX’s Starship Human Landing System is planned to meet Orion in Earth orbit. Before that, the company intends to launch multiple Starships to low Earth orbit to transfer cryogenic propellant to a depot vehicle, which will fuel the lunar lander. After docking with Orion and its crew, Starship would send the combined spacecraft toward the Moon, enter low lunar orbit and carry two astronauts to the surface. NASA says it is working to modify Orion so Starship can push it toward the Moon.
Blue Origin’s revised 2028 plan defers propellant transfer and uses three transfer stages to send its Blue Moon Mark 2 Alpha lander toward the Moon. The stages and lander would assemble in low Earth orbit and travel to an elliptical polar lunar orbit, with the stages separating as their propellant is spent. Two astronauts would move from Orion to the lander, descend to the lunar South Pole and return to Orion after surface operations. Blue Origin is also expected to demonstrate the full transfer-stage mission without a crew.
How the New Orbits Change the Mission
The revised architectures are intended to make the landers’ paths to and from the lunar surface more workable, but they rely on different technical approaches. NASA says using low lunar orbit for Starship can reduce the propellant it needs to aggregate in space and shorten the time for astronauts to return from the surface and reconnect with Orion. The Earth-orbit rendezvous also gives the agency more flexibility in when the SLS crew launch occurs, according to NASA.
For Blue Origin, NASA says an elliptical polar orbit can reduce the lander’s propellant requirements, make returns to Orion from the surface faster than the previously planned orbit, and make greater use of SLS performance. These are agency descriptions of the plans, not evidence that either system has completed the required demonstrations or is ready to carry astronauts. The immediate stakes are whether the changes can help keep a 2028 landing within reach while meeting NASA’s safety requirements.
The plans also leave NASA with two competing lander providers for the initial crewed missions. The agency says it will decide which company flies first based on lander readiness, followed by a second crewed landing opportunity. That makes demonstration results and development progress central to the sequence of missions.
Popular right now

Hisense 75-Inch E6SR Series Hi-QLED 4K UHD Smart Roku TV (2026 Model)

KitchenAid Artisan 5-Quart Tilt-Head Stand Mixer, Almond Cream

Dyson V15s Detect Submarine Wet and Dry Vacuum, Yellow/Nickel
As an affiliate, we earn on qualifying purchases.
Artemis Lander Plans Shift
NASA’s initial contracts with SpaceX and Blue Origin set the companies on separate paths to provide human landing systems for Artemis. The agency has since redefined Artemis III to demonstrate rendezvous and docking between test versions of the two landers and Orion in low Earth orbit next year, rather than treating the mission as the previously planned crewed lunar landing. NASA’s update describes the revised test and mission arrangements as part of its effort to reach the lunar surface with astronauts in 2028.
The original plan called for Orion and a lander to rendezvous in a near-rectilinear halo orbit around the Moon. NASA says the revised plans instead use orbits shaped to each provider’s system: Earth orbit for the Starship-Orion rendezvous and an elliptical polar orbit for Blue Origin’s lander mission. Both companies’ uncrewed demonstrations are required before their crewed missions. NASA has also described initial lunar surface missions as including two approximately two-hour moonwalks for sample collection and tests of spacesuits supplied by Axiom Space.
NASA Administrator Jared Isaacman framed the work as part of the agency’s push toward a lunar return and a longer-term presence. NASA’s announcement also refers to plans for a Moon Base, but the lander changes described here concern the near-term Artemis missions and do not establish a date for a permanent base.
Readiness and Mission Dates Remain Open
The 2028 landing remains a NASA target; the announcement does not confirm that either lander will be ready by then. NASA has not yet selected which provider will carry the first crew, saying that choice will depend on readiness. The update also does not give a definitive schedule for the uncrewed demonstrations or confirm that either company’s revised architecture has completed its required tests.
Important execution details remain in development. SpaceX’s approach requires multiple launches and cryogenic propellant transfers in orbit, while Blue Origin’s plan depends on a sequence of transfer stages and a demonstration of the full mission profile. NASA’s announcement sets out intended operations but does not provide performance results or a detailed assessment of schedule risk. The timing and precise configuration of the second crewed landing are also not specified.
Uncrewed Tests Will Set the Pace
The next major milestones are the uncrewed demonstrations required of both providers. SpaceX is to demonstrate its in-space propellant aggregation approach; Blue Origin is to test its lander transfer-stage mission profile. NASA’s revised Artemis III plan also calls for test versions of the landers to rendezvous and dock with Orion in low Earth orbit next year, according to the agency’s announcement.
NASA says it will certify each lander before any crewed flight and choose the first provider based on readiness. If the systems meet the agency’s requirements, the current plan is for a crew to launch in Orion, transfer to a lander, conduct lunar surface work and return to Orion. NASA has not provided a final crewed launch date beyond its 2028 target, so further schedule information and test outcomes will determine whether that goal holds.
Key Questions
What did NASA change about the lunar lander plans?
NASA changed the planned rendezvous orbits. SpaceX’s Starship lander is to meet Orion in Earth orbit, while Blue Origin’s lander is to meet Orion in an elliptical polar orbit around the Moon. Both plans replace the previously described near-rectilinear halo orbit approach.
When is NASA targeting a crewed Moon landing?
NASA says it is working toward a crewed lunar landing in 2028. That is a target, not a confirmed launch date, and the agency says the first provider will be chosen based on lander readiness.
Which company will land astronauts first?
NASA has not decided. The agency says it will select the provider based on readiness after evaluating development progress and required demonstrations.
What must SpaceX and Blue Origin do before flying astronauts?
Each company must perform an uncrewed demonstration with its crewed lander before a crewed lunar mission. NASA says it will certify the lander systems before they carry astronauts.
What will astronauts do on the initial surface missions?
NASA is targeting two roughly two-hour moonwalks during initial surface missions, including lunar sample collection and tests of spacesuits provided by Axiom Space.
Source: primary
